top of page

MUMBAI, INDIA

MUMBAI MONORAIL

2009

Mumbai Monorail Line stretches  19 km long running through a densely populated over a complex urban geometry. Monosist was part of a consortium led by PJSI Consultant KL, responsible for providing preliminary concept design and planning of the stations and depot building.

 

Leveraging our experience on the Kuala Lumpur Monorail System with similar urban design challenges, Monosist designed a standard 64-meter-long station typology along the alignment across Mumbai's busiest route.  A central column supporting station structure is adopted to avoid tampering with massive underground utilities normally laid on both sides of the roads throughout the whole alignment.     

 

​

GET IN TOUCH:

CONTACT US:

MONOSIST is a multidiciplinary company of architecture and design, delivering consultancy services for the entire building process.

​

​

​

Menara Ochere, Z1-11 Level 3

Jalan Alamanda, Presint 1,

62000, Putrajaya, MALAYSIA

Tel: 603 8861 3388 

​

Email: admin@monosist.com

© by MONOSIST

FEATURED PROJECTS

© 2018 by MONOSIST

01/3

Monosist is currently engaged as Detailed Design Consultant for the completion of KVMRT line 2 project.  The package includes elevated stations (6 numbers), multi storey park & ride (3 numbers), relocation of Institute for Agriculture Training and Development Centre.  

admin-hostel_edited.jpg

02/3

FEATURED PROJECTS

01/3

Monosist is currently engaged as Detailed Design Consultant for the completion of KVMRT line 2 project.  The package includes elevated stations (6 numbers), multi storey park & ride (3 numbers), relocation of Institute for Agriculture Training and Development Centre.  

admin-hostel_edited.jpg

02/3

2.jpg

03/3

SEKOLAH RENDAH PRESINT 8 (3) PUTRAJAYA
bottom of page