top of page

KLANG VALLEY

MRT LINE 2 Southern Section (Serdang -Putrajaya)

Monosist has been appointed as a Detailed Design Consultant (DDC) for the construction of the southern section of KV MRT Line 2.  The scope of work covers a 10.5 km southern section corridor that includes 6 numbers of stations, Multi Storey Park & Ride, and other facilities.  The 120-meter-long elevated stations are designed to cater for the ultimate passenger capacity of 33000 passengers per hour per direction by the year 2052.  

The design maximizes urban design opportunities with good connectivity between people and surrounding places. The design adopts a simple box shape with vertical louvers and perforated aluminum panels screening the rail track and protecting the platform form elements.

GET IN TOUCH:

CONTACT US:

MONOSIST is a multidiciplinary company of architecture and design, delivering consultancy services for the entire building process.

​

​

​

Menara Ochere, Z1-11 Level 3

Jalan Alamanda, Presint 1,

62000, Putrajaya, MALAYSIA

Tel: 603 8861 3388 

​

Email: admin@monosist.com

© by MONOSIST

FEATURED PROJECTS

© 2018 by MONOSIST

01/3

Monosist is currently engaged as Detailed Design Consultant for the completion of KVMRT line 2 project.  The package includes elevated stations (6 numbers), multi storey park & ride (3 numbers), relocation of Institute for Agriculture Training and Development Centre.  

admin-hostel_edited.jpg

02/3

FEATURED PROJECTS

01/3

Monosist is currently engaged as Detailed Design Consultant for the completion of KVMRT line 2 project.  The package includes elevated stations (6 numbers), multi storey park & ride (3 numbers), relocation of Institute for Agriculture Training and Development Centre.  

admin-hostel_edited.jpg

02/3

2.jpg

03/3

SEKOLAH RENDAH PRESINT 8 (3) PUTRAJAYA
bottom of page